A strict, fact-based chronological ledger of building physics events, statutory notices, social housing regulatory frameworks, and physical evidence. Prepared in accordance with the Civil Evidence Act 1995, the Pre-Action Protocol for Housing Conditions Claims, and the Housing Ombudsman Scheme.
Implied absolute covenants to maintain structure/exterior and installations for space heating, water, and sanitation. Augmented by the Homes (Fitness for Human Habitation) Act 2018 (s.9A) requiring dwelling to be free from Category 1 HHSRS hazards throughout tenancy.
Inserts s.10A into LTA 1985. Mandates strict statutory deadlines for registered providers to investigate, report, and remediate damp, mould, and emergency safety hazards, explicitly prohibiting inaction and tenant-blaming.
Defines actionable hazards: Excess Cold (Cat 1), Damp & Mould Growth (Cat 1), Electrical Hazards (Cat 1/2), and Fire Protection defaults. Local Authority has a mandatory duty to take enforcement action on Cat 1 hazards.
Prohibits discrimination against disabled tenants in premises management. Mandates reasonable adjustments to provisions, criteria, and practices (including email-only communication and 7-day advance notice for contractor inspections).
Safety and Quality Standard & Transparency, Influence and Accountability Standard. Enforces statutory landlord obligations regarding electrical certification, fire safety, and fair complaints handling.
Mandatory electrical safety inspection (EICR); strict prohibition under BS 5839-6 Clause 15.2 of tapping auxiliary loads onto domestic smoke-alarm circuits; and BS 5250:2021 moisture control preventing non-breathable roof membranes.
Statutory Right to Acquire framework for housing association tenants, establishing prescribed statutory discount and clear qualification rules independent of legacy council RTB delays.
Statutory duty of care owed by landlords with repair obligations to prevent defects in the premises from causing damage to personal property or personal injury/illness.
| Date / Era | Statutory Domain | Contemporaneous Event / Notified Breach | Statutory Duty / Physics Baseline | Physical Evidence Link |
|---|---|---|---|---|
| 1970s Era |
DPA 1972 s.1 Building Regulations |
Property Construction & Cold-Roof Envelope Baseline 55 Cordingley Close constructed. Traditional pitched cold-roof design engineered for passive vapour venting via breathable tile laps without impermeable moisture traps. |
Statutory duty of proper construction fit for habitation; baseline structural envelope. | Title Deed WYK726362 |
| 1994 – 1995 |
Building Standards Lifecycle Expiry |
Date-Stamped Services in Loft Space Cold-water storage cistern and loft wiring installed bearing 1994 manufacturer date stamps. Installations now 30+ years old and beyond design service life. |
Landlord asset management duty to survey, maintain, and renew life-expired domestic plant and services. | Loft Date Stamp Photos |
| 24 Dec 2021 |
LTA 1985 s.11(1)(c) Gas Safety Regs (Reg 36) |
New Boiler Installation (Pre-Occupation) Central heating boiler installed on Christmas Eve prior to tenant key collection. External wall penetrations created; safety commissioning completed. |
Absolute landlord obligation to keep heating and hot water installations in proper working order. | Boiler Commissioning Doc |
| 27 Dec 2021 |
LTA 1985 s.9A Housing Act 1988 |
Formal Tenancy Inception (Ref: 1152959) Tenancy commenced. Contract terms include Clause 3.26(h) statutory repair exemptions and Clauses 5.4/5.5 disrepair compensation mechanisms. |
Homes (Fitness for Human Habitation) Act 2018 implied covenant that premises remain fit throughout tenancy. | Tenancy Agreement 1152959 |
| 01 Feb 2022 |
LTA 1985 s.11(1)(a) HHSRS Excess Cold (Cat 1) |
Flooring Holes & Substrate Thermal Bypass Notified Calling note recorded regarding void penetrations beneath flooring substrate, creating severe cold draughts and convective stack-effect thermal loss. |
Duty to maintain structure and exterior and eliminate Category 1 Excess Cold hazards. | Calling Note (Flooring Holes) |
| 2023 Period |
Social Housing Act 2023 HHSRS Damp & Mould (Cat 1) |
Repairs Manager Dispute: "Vent vs. Dehumidifier" Tenant formally notified persistent mould and condensation. Landlord repairs management deferred remedial capital works to 2037, offering ad-hoc dehumidifier advice rather than curing building-physics envelope failures. |
Duty under Social Housing (Regulation) Act 2023 to address damp and mould hazards proactively rather than blaming tenant lifestyle. | 2023 Repairs Correspondence |
| 28 May 2024 |
BS 7671 Regs RSH Safety Standard |
Statutory Electrical Safety Certificate (EICR) Expired 5-year mandatory Electrical Installation Condition Report expired without compliant re-inspection or renewal. Public safety register reflects uncertificated status. |
Breach of Regulator of Social Housing Safety & Quality Standard; absolute statutory duty to maintain valid EICR. | EICR Expiry Notice |
| 20 Aug 2026 |
Housing Act 1996 Land Registration Act 2002 |
Title Deed Interrogation & Freehold Covenants Official copy of Title Register WYK726362 extracted. Covenants and estate curtilage verified for statutory acquisition. |
Determination of legal estate boundaries and landlord statutory capacity. | Title WYK726362 Summary |
| 22 Sep 2026 |
BS 5839-6 / BS 7671 BS 5250:2021 (Moisture) |
Forensic Survey: Impermeable Roof Plastic & PIV Fire Circuit Bypass Technical inspection establishes: (1) Impermeable plastic sheeting beneath roof tiles trapping moisture in loft void; (2) Uncertificated 400W–500W Nuaire PIV heater (DRI-ECO-HEAT-HC) spurred directly into domestic smoke-alarm circuit, creating continuous parasitic load and fire hazard. |
Breach of BS 5839-6 Clause 15.2 (strictly prohibiting non-fire loads on fire circuits) and BS 5250:2021 moisture control standards. | Technical Report & Circuit Audit |
| 26 Sep 2026 |
Pre-Action Protocol Civil Procedure Rules |
Service of Formal Notice Before Action & Special Damages Schedule Formal Letter Before Action served on Incommunities Limited detailing comprehensive disrepair, electrical safety violations, and £19,261.08 in quantified special damages (including £5,400 parasitic electricity load). |
Pre-Action Protocol for Housing Conditions Claims; CPR Part 36 / Part 7 readiness. | Schedule of Special Damages (£19k) |
| 29 Sep 2026 |
Equality Act 2010 s.20 Quiet Enjoyment |
Service of Contractor Inspection and Sign-In Protocol Formal protocol served confirming access is granted subject to: (1) Agreed written notice (min 7 days) by email; (2) Pre-identified contractor scope; (3) Verification of competence and sign-in. Reasonably adjusted to protect health and prevent trauma. |
Statutory duty of landlord to make reasonable adjustments to provisions, criteria, and practices under s.20(3) Equality Act 2010. | Contractor Protocol Document |
| 03 Nov 2026 |
Housing Act 1996 RTA Framework |
Notice of Intention: Right to Acquire (RTA) Transition Formal communication detailing intention to decouple from RTB administrative delays and proceed under the statutory Right to Acquire (RTA1) framework, offsetting purchase against quantified disrepair damages. |
Housing Act 1996 Part I (ss.16-17) Right to Acquire statutory entitlement. | RTA Transition Notice Email |
| 04 Nov 2026 |
Housing Ombudsman Complaint Code |
Incommunities Stage 2 Complaint Acknowledgement (Ref: 00547091) Letter from Complaint Management Team (Kamil Nowak) confirming Stage 2 escalation allocated to Claire Walker (20 working days). Inaccurately characterised tenant outcome as "cancellation of contractor visits". |
Housing Ombudsman Complaint Handling Code; Landlord duty of fair investigation. | Stage 2 Letter (Ref: 00547091) |
| 05 Nov 2026 |
Housing Act 1996 Right to Acquire Form RTA1 |
Formal Service of Form RTA1 Formal submission of Right to Acquire application under Housing Act 1996 ss.16-17, cleanly establishing new statutory timeline and qualification discount. |
Statutory application initiating 4-week landlord response window under RTA regulations. | Form RTA1 Submission Pack |
| 17 Nov 2026 |
Housing Ombudsman Statutory Oversight |
Housing Ombudsman Automated Ingestion Unblocked Housing Ombudsman central servers process queued filings across Stage 2 escalation, RTA1 transition, and RTB service notices (auto-replies received). |
Statutory dispute resolution oversight under the Housing Act 1996 Schedule 2. | Ombudsman Email Receipts |